W. T. Chan
- Decision Framework for Pavement Friction Management of Airport Runways. Dans: Journal of Transportation Engineering, v. 123, n. 6 (novembre 1997). (1997):
- Optimal Vertical Alignment Analysis for Highway Design. Dans: Journal of Transportation Engineering, v. 128, n. 5 (septembre 2002). (2002):
- Genetic-Algorithm Programming of Road Maintenance and Rehabilitation. Dans: Journal of Transportation Engineering, v. 122, n. 3 (mai 1996). (1996):
- Multiobjective Optimization for Pavement Maintenance Programming. Dans: Journal of Transportation Engineering, v. 126, n. 5 (septembre 2000). (2000):
- Road‐Maintenance Planning Using Genetic Algorithms. II: Analysis. Dans: Journal of Transportation Engineering, v. 120, n. 5 (septembre 1994). (1994):
- Road‐Maintenance Planning Using Genetic Algorithms. I: Formulation. Dans: Journal of Transportation Engineering, v. 120, n. 5 (septembre 1994). (1994):
- Priority Rating of Highway Maintenance Needs by Neural Networks. Dans: Journal of Transportation Engineering, v. 119, n. 3 (mai 1993). (1993):
- Application of the Building Environmental Performance Model (BEPM) in Hong Kong. Dans: Energy and Buildings, v. 37, n. 8 (août 2005). (2005):
- Building calibration for IAQ management. Dans: Building and Environment, v. 41, n. 7 (juillet 2006). (2006):
- The Role of Systems Thinking in Systems Engineering, Design and Management. Dans: Civil Engineering Dimension / Dimensi Teknik Sipil, v. 17, n. 3 (décembre 2015). (2015):
- A New Indoor Environmental Quality Equation for Air-Conditioned Buildings. Dans: Architectural Science Review, v. 48, n. 1 (mars 2005). (2005):
- Effective stiffness of coupling beams connected to walls in out-of-plane directions. Dans: Computers & Structures, v. 75, n. 4 (avril 2000). (2000):
- Production Scheduling for Precast Plants using a Flow Shop Sequencing Model. Dans: Journal of Computing in Civil Engineering, v. 16, n. 3 (juillet 2002). (2002):
- Case-Based Reasoning Approach in Bid Decision Making. Dans: Journal of Construction Engineering and Management, v. 127, n. 1 (février 2001). (2001):
- Constraint Programming Approach to Precast Production Scheduling. Dans: Journal of Construction Engineering and Management, v. 128, n. 6 (décembre 2002). (2002):
- Non-planar beam–wall joints in tall building structures. Dans: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 140, n. 1 (février 2000). (2000):