Patrick Cassity
- Sequential Stressing of Cable-Stayed Bridges Erected on Falsework. Présenté pendant: IABSE Conference: Cable-Supported Bridges - Challenging Technical Limits, Seoul, South Korea, 12-14 June 2001. (2001):
- Graceful Gateway. Dans: Civil Engineering Magazine, v. 81, n. 11 (novembre 2011). (2011):
- Reconnected. Dans: Civil Engineering Magazine, v. 79, n. 9 (septembre 2009). (2009):
- Reconnected. Dans: Civil Engineering Magazine, v. 79, n. 7 (juillet 2009). (2009):
- (2008): US 90 Bridge Over Biloxi Bay-A Design-Build Solution to Katrina Recovery. Présenté pendant: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008.
- (2008): The Christopher S. Bond Bridge – An Icon for Kansas City, Missouri. Présenté pendant: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008.
- (2008): US 20 Arch over the Mississippi River. Présenté pendant: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008.