Carlos H. Caldas
- Statistical Analysis of the Effectiveness of Management Programs in Improving Construction Labor Productivity on Large Industrial Projects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 1 (janvier 2016). (2016):
- Methodology for the Integration of Project Documents in Model-Based Information Systems. Dans: Journal of Computing in Civil Engineering, v. 19, n. 1 (janvier 2005). (2005):
- Methodology for Automating the Identification and Localization of Construction Components on Industrial Projects. Dans: Journal of Computing in Civil Engineering, v. 23, n. 1 (janvier 2009). (2009):
- Quantifying combination effects of project management practices on cost performance. Dans: KSCE Journal of Civil Engineering, v. 21, n. 3 (mai 2016). (2016):
- Performance Dashboard for a Pharmaceutical Project Benchmarking Program. Dans: Journal of Construction Engineering and Management, v. 138, n. 7 (juillet 2012). (2012):
- Method to Assess the Level of Implementation of Productivity Practices on Industrial Projects. Dans: Journal of Construction Engineering and Management, v. 141, n. 1 (janvier 2015). (2015):
- Relationship between Automation and Integration of Construction Information Systems and Labor Productivity. Dans: Journal of Construction Engineering and Management, v. 135, n. 8 (août 2009). (2009):
- Real-Time Three-Dimensional Occupancy Grid Modeling for the Detection and Tracking of Construction Resources. Dans: Journal of Construction Engineering and Management, v. 133, n. 11 (novembre 2007). (2007):
- Validation Methodologies and Their Impact in Construction Productivity Research. Dans: Journal of Construction Engineering and Management, v. 140, n. 10 (octobre 2014). (2014):
- A Methodology for Object Identification and Tracking in Construction Based on Spatial Modeling and Image Matching Techniques. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 24, n. 3 (avril 2009). (2009):
- An object recognition, tracking, and contextual reasoning-based video interpretation method for rapid productivity analysis of construction operations. Dans: Automation in Construction, v. 20, n. 8 (décembre 2011). (2011):
- Using Global Positioning System to Improve Materials-Locating Processes on Industrial Projects. Dans: Journal of Construction Engineering and Management, v. 132, n. 7 (juillet 2006). (2006):
- Tracking the Location of Materials on Construction Job Sites. Dans: Journal of Construction Engineering and Management, v. 132, n. 9 (septembre 2006). (2006):
- Negotiation‐based decision support model for utility relocations in transportation infrastructure projects. Dans: Construction Management and Economics, v. 26, n. 10 (octobre 2008). (2008):