Rafael A. Bueno
- Cost Contingency Management. Dans: Journal of Management in Engineering (ASCE), v. 23, n. 3 (juillet 2007). (2007):
- Probabilistic Control of Project Performance Using Control Limit Curves. Dans: Journal of Construction Engineering and Management, v. 133, n. 12 (décembre 2007). (2007):