Michael Brett
- Vibration serviceability assessment of the world's longest suspended footbridge in 2020. Dans: Structures, v. 44 (octobre 2022). (2022):
- Theoretical and experimental analysis of the quasi-static and dynamic behaviour of the world's longest suspension footbridge in 2020. Dans: Engineering Structures, v. 253 (février 2022). (2022):
- Comparison between cork-based and conventional green roof solutions. Dans: Building and Environment, v. 175 (mai 2020). (2020):
- Urine recovery at the building level. Dans: Building and Environment, v. 156 (juin 2019). (2019):