Halim Boussabaine
- Critical success factors for public–private partnerships in smart city infrastructure projects. Dans: Construction Innovation. :
- The influence of risks on the outturn cost of ICT infrastructure network projects. Dans: Construction Innovation, v. 23, n. 1 (septembre 2021). (2021):
- An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Dans: Engineering, Construction and Architectural Management, v. 26, n. 8 (août 2019). (2019):
- Emerging contractual and legal risks from the application of building information modelling. Dans: Engineering, Construction and Architectural Management, v. 26, n. 10 (octobre 2019). (2019):
- Re-evaluating the risk costing agenda in PPP projects. Dans: Built Environment Project and Asset Management, v. 11, n. 1 (octobre 2020). (2020):
- Interdependency of the critical success factors and ex-post performance indicators of PPP projects. Dans: Built Environment Project and Asset Management, v. 7, n. 5 (novembre 2017). (2017):
- Schools design quality: A user perspective. Dans: Architectural Engineering and Design Management, v. 8, n. 4 (novembre 2012). (2012):
- Quantifying Environmental Impacts and Eco-costs from Brick Waste. Dans: Architectural Engineering and Design Management, v. 6, n. 3 (janvier 2010). (2010):