Pedro Borges
- Construcción de vanos de 90m con cimbra autolanzable. Un caso practico. Dans: Hormigón y acero. :
- Bridge Engineering Optimization Opportunities Through Integrated Solutions: Design – Constructive Method. Dans: (2021): Developments in International Bridge Engineering. Springer, Cham (Allemagne), ISBN 978-3-030-59168-7. (2021):
- (2018): Construction of 90m multi-span viaducts with span by span – A New Possibility in Bridge Engineering. Présenté pendant: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018.
- New Frontiers in Multi-span Prestressed Concrete Deck Construction: A Case Study. Dans: Structural Engineering International, v. 31, n. 1 (janvier 2021). (2021):
- Automation robustness of scaffolding systems strengthened with organic prestressing. Dans: Automation in Construction, v. 19, n. 1 (janvier 2010). (2010):
- Technical Challenges of Large Movable Scaffolding Systems. Dans: Structural Engineering International, v. 21, n. 4 (novembre 2011). (2011):