A. Boniface
- 1. La préparation du terrain: b) Les comblements du lac. Dans: Bulletin technique de la Suisse romande, v. 90, n. 1 (11 janvier 1964). (1964):
- Die See-Auffüllung für die EXPO 64. Dans: Schweizerische Bauzeitung (1947-1978), v. 81, n. 47 (21 novembre 1963). (1963):
- Lesotho Highlands Water Project—design and construction of the Transfer Tunnel. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 120, n. 5 (mai 1997). (1997):
- Some technical lessons learnt from construction of the Lesotho Highlands Water Project transfer tunnel. Dans: Tunnelling and Underground Space Technology, v. 14, n. 1 (janvier 1999). (1999):
- Tunnelling projects in Southern Africa. Dans: Tunnelling and Underground Space Technology, v. 13, n. 1 (janvier 1998). (1998):
- Tunnel Boring Machine performance in basalts of the Lesotho Formation. Dans: Tunnelling and Underground Space Technology, v. 15, n. 1 (janvier 2000). (2000):
- Planning and design of the transfer tunnel for the Lesotho highlands water project. Dans: Tunnelling and Underground Space Technology, v. 9, n. 1 (janvier 1994). (1994):