Paul Bonapace
- Der Untertagebau im Baulos Prutz/Ried des Gemeinschaftskraftwerks Inn (GKI). Dans: Geomechanics and Tunnelling, v. 12, n. 3 (juin 2019). (2019):
- Strain measurements at the transition from a rock supported to an unsupported steel lined pressure tunnel at the Kaunertal hydropower station. Dans: Geomechanics and Tunnelling, v. 10, n. 5 (octobre 2017). (2017):
- Headrace tunnels at Tiwag - Experience, examples, existing tunnels and projects under consideration / Erfahrungen, Beispiele, Bestand und Neubauüberlegungen zu Triebwasserwegen der Tiwag. Dans: Geomechanics and Tunnelling, v. 8, n. 1 ( 2015). (2015):
- The renewal of the pressure shaft for the Kaunertal high-head hydropower plant in Austria. Dans: Steel Construction, v. 6, n. 4 (décembre 2013). (2013):
- New penstock at the Kaunertal hydropower station - site investigation and grouting concept / Neubau Druckschacht KW Kaunertal - Baugrunderkundung und Injektionskonzept. Dans: Geomechanics and Tunnelling, v. 6, n. 5 ( 2013). (2013):
- Renewal of the pressure shaft and surge tank of the Kaunertal power station / Der Neubau des Kraftabstiegs und des Wasserschlosses für das Kaunertalkraftwerk. Dans: Geomechanics and Tunnelling, v. 5, n. 5 ( 2012). (2012):
- Tunnelvortriebe im Schutz von DSV-Sicherungen. Dans: Felsbau, v. 23, n. 5 ( 2005). (2005):
- Sir Adam Beck Niagara Power Generating Complex. Dans: (2008): The Austrian Art of Tunnelling. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wisenschaften GmBH und Co. KG, Berlin (Allemagne), ISBN 978-3-433-02924-4. (2008):