- Effects of constitutive soil models on the seismic response of an offshore jacket platform in clay by considering pile-soil-structure interaction. Dans: Soil Dynamics and Earthquake Engineering, v. 174 (novembre 2023). (2023):
- (2022): Laboratory Investigation of Using Calcium Lignosulfonate as an Oxidation Inhibitor in Bitumen. Dans: Advances in Civil Engineering, v. 2022 (janvier 2022).
- The pros and cons of using calcium lignosulfonate as a recycled anti-aging additive on engineering properties of bituminous mastics. Dans: Case Studies in Construction Materials, v. 15 (décembre 2021). (2021):
- Rheological evaluation of asphalt binder modified by amorphous poly alpha olefin (APAO). Dans: Construction and Building Materials, v. 314 (janvier 2022). (2022):
- (2021): Evaluation of Rutting and Fatigue Behaviors of Asphalt Binders Modified with Calcium Lignosulfonate. Dans: Advances in Civil Engineering, v. 2021 (janvier 2021).
- An Analytical Model to Study the Behavior of Non-connected Piled Rafts with Granular Cushion Subjected to Vertical Load. Dans: International Journal of Civil Engineering, v. 19, n. 8 (mai 2021). (2021):
- Influence of Cement – Sodium Silicate Grout Admixed With Calcium Chloride and Kaolinite on Sapric Peat/ Saprogeninių durpių poveikis cemento ir natrio silikato skiedinio su kalcio chloridu bei kaolinitu savybėms. Dans: Journal of Civil Engineering and Management, v. 17, n. 3 (septembre 2011). (2011):
- Seismic analysis of the soil–structure interaction for a high rise building adjacent to deep excavation. Dans: Soil Dynamics and Earthquake Engineering, v. 79 (décembre 2015). (2015):
- Experimental Investigation of Bond Stress and Creep Displacements of GFRP Soil Nails Simulated in a Soil Box. Dans: International Journal of Civil Engineering, v. 17, n. 10 (mars 2019). (2019):
- Properties and Performance of Concrete Made with Recycled Low-Quality Crushed Brick. Dans: Journal of Materials in Civil Engineering (ASCE), v. 24, n. 4 (avril 2012). (2012):
- Mathematical model to optimally solve the lift planning problem in high-rise construction projects. Dans: Automation in Construction, v. 92 (août 2018). (2018):