T. Bock
- Cable-driven parallel robot for curtain wall module installation. Dans: Automation in Construction, v. 138 (juin 2022). (2022):
- Matching kit interface for building refurbishment processes with 2D modules. Dans: Automation in Construction, v. 110 (février 2020). (2020):
- Automatic generation of the controlling-system for a wall construction robot. Dans: Automation in Construction, v. 5, n. 1 (mars 1996). (1996):
- Fall Detection and Intervention based on Wireless Sensor Network Technologies. Dans: Automation in Construction, v. 71 (novembre 2016). (2016):
- Automatisierungsgerechtes Planen und Konstruieren für computerintegriertes Bauen. Dans: Bautechnik, v. 69, n. 3 (mars 1992). (1992):