Klaus Berger
- Results from 18 Years of In Situ Performance Testing of Landfill Cover Systems in Germany. Dans: Journal of Environmental Engineering (ASCE), v. 136, n. 8 (août 2010). (2010):
- Current state of design and construction for the St. Kanzian tunnel chain / Aktueller Planungs- und Ausführungsstand der Tunnelkette St. Kanzian. Dans: Geomechanics and Tunnelling, v. 8, n. 6 ( 2015). (2015):