Václav Beran
- (2022): Time and Cost Schedule Dynamic–Hidden Trojan Horses. Dans: Buildings, v. 12, n. 12 (1 décembre 2022).
- Nonlinear optimisation and rational cash flow. Dans: Engineering, Construction and Architectural Management, v. 14, n. 3 (mai 2007). (2007):
- The Life-cycle cost of bridges – first steps to a holistic approach. Dans: The Baltic Journal of Road and Bridge Engineering, v. 11, n. 2 (juin 2016). (2016):