Andreas Benardos
- Evaluation of fire smoke control in underground space. Dans: Underground Space, v. 7, n. 3 (juin 2022). (2022):
- Assessing the failure potential of tunnels and the impacts on cost overruns and project delays. Dans: Tunnelling and Underground Space Technology, v. 123 (mai 2022). (2022):
- Measuring and benchmarking the benefits of Athens metro extension using an ex-post cost benefit analysis. Dans: Tunnelling and Underground Space Technology, v. 111 (mai 2021). (2021):
- probabilistic time and cost risk analysis of a challenging part of an urban tunneling project. Dans: Tunnelling and Underground Space Technology, v. 58 (septembre 2016). (2016):
- Assessing the construction cost of Greek transportation tunnel projects. Dans: Tunnelling and Underground Space Technology, v. 38 (septembre 2013). (2013):