Hana Begić
- Active BIM system for optimized multi-project ready-mix-concrete delivery. Dans: Engineering, Construction and Architectural Management. :
- Possibilities of Using Prefabricated Modular Panels for Building NZEB Buildings in Earthquake-Affected Areas in Croatia – Case Study. Dans: International Journal of Sustainable Construction Engineering Technology, v. 13, n. 1 (16 mai 2022). (2022):
- Digitalization and automation in construction project’s life-cycle: a review. Dans: Journal of Information Technology in Construction, v. 27 (janvier 2022). (2022):
- (2021): A Systematic Review of Construction 4.0 in the Context of the BIM 4.0 Premise. Dans: Buildings, v. 11, n. 8 (27 juillet 2021).