David Baird
- (2012): Monitoring a 150-year-old bridge during construction of an underpass for the London 2012 Games. Présenté pendant: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- Delivering London 2012: structures, bridges and highways. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 164, n. 6 (novembre 2011). (2011):
- Design of the London 2012 Olympic Park Bridges H01 and L01, UK. Dans: Structural Engineering International, v. 21, n. 1 (février 2011). (2011):
- Footbridges for the London 2012 Olympic and Paralympic Games. Présenté pendant: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- Design of the Olympic Park Bridge L01. Présenté pendant: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- Bridges, short and long term solutions for the London 2012 Games. Présenté pendant: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- Design of the London 2012 Olympic Park Bridges H01 and L01. Présenté pendant: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):