Shuo Bai
- (2024): A 3D Parameterized BIM-Modeling Method for Complex Engineering Structures in Building Construction Projects. Dans: Buildings, v. 14, n. 6 (19 juin 2024).
- (2022): Productivity Prediction and Analysis Method of Large Trailing Suction Hopper Dredger Based on Construction Big Data. Dans: Buildings, v. 12, n. 10 (20 septembre 2022).
- A multiple-point monitoring model for concrete dam displacements based on correlated multiple-output support vector regression. Dans: Structural Health Monitoring, v. 21, n. 6 (mars 2022). (2022):
- Global Time Optimization Method for Dredging Construction Cycles of Trailing Suction Hopper Dredger Based on Grey System Model. Dans: Journal of Construction Engineering and Management, v. 148, n. 2 (février 2022). (2022):
- Digital twin-driven virtual sensor approach for safe construction operations of trailing suction hopper dredger. Dans: Automation in Construction, v. 132 (décembre 2021). (2021):
- Productivity estimation of cutter suction dredger operation through data mining and learning from real-time big data. Dans: Engineering, Construction and Architectural Management, v. 28, n. 7 ( 2021). (2021):
- Productivity analysis of trailing suction hopper dredgers using stacking strategy. Dans: Automation in Construction, v. 122 (février 2021). (2021):
- Developing a Common Library of Prefabricated Structure Components through Graphic Media Mapping to Improve Design Efficiency. Dans: Journal of Construction Engineering and Management, v. 147, n. 1 (janvier 2021). (2021):
- Data mining approach to construction productivity prediction for cutter suction dredgers. Dans: Automation in Construction, v. 105 (septembre 2019). (2019):