- Improving Estimate at Completion (EAC) Cost of Construction Projects Using Adaptive Neuro-Fuzzy Inference System (ANFIS). Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 2 (février 2022). (2022):
- (2021): Ranking Sustainable Projects through an Innovative Hybrid DEMATEL-VIKOR Decision-Making Approach Using Z-Number. Dans: Advances in Civil Engineering, v. 2021 (janvier 2021).
- (2021): Implementation of Building Information Modeling (BIM) Using Hybrid Z-DEMATEL-ISM Approach. Dans: Advances in Civil Engineering, v. 2021 (janvier 2021).
- Application of Fuzzy Modelling to Predict Construction Projects Cash Flow. Dans: Periodica Polytechnica Civil Engineering. :
- Optimizing Cash-Flow-at-Risk in Construction Projects: A Cost Reduction Approach. Dans: Periodica Polytechnica Civil Engineering, v. 60, n. 3 ( 2016). (2016):
- Finding Optimum Resource Allocation to Optimizing Construction Project Time/Cost through Combination of Artificial Agents CPM and GA. Dans: Periodica Polytechnica Civil Engineering, v. 60, n. 2 ( 2016). (2016):
- Interpretive Structural Modeling in Earned Value Management. Dans: Journal of Civil Engineering and Management, v. 26, n. 6 (8 juin 2020). (2020):
- Project Completion Time and Cost Prediction Using Change Point Analysis. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 5 (septembre 2015). (2015):
- Application of Risk Analysis Within Value Management: A Case Study in Dam Engineering. Dans: Journal of Civil Engineering and Management, v. 19, n. 3 (juin 2013). (2013):
- Resource Pool Location for Periodic Services in Decentralized Multi-Project Scheduling Problems. Dans: Journal of Computing in Civil Engineering, v. 31, n. 5 (septembre 2017). (2017):