Dietmar Bach
- Herausfordernde Projekte in Österreich. Dans: Geomechanics and Tunnelling, v. 16, n. 4 (août 2023). (2023):
- The application of the guideline for the geotechnical design of underground structures with TBM excavation in Austria. Dans: Geomechanics and Tunnelling, v. 16, n. 1 (février 2023). (2023):
- Abwicklung von Tunnelbauvorhaben – Analyse der Ist‐Situation. Dans: Geomechanics and Tunnelling, v. 14, n. 6 (décembre 2021). (2021):
- use of TBM process data as a normative basis of the contractual advance classification for TBM advances in hard rock. Dans: Geomechanics and Tunnelling, v. 11, n. 5 (octobre 2018). (2018):
- Risk analysis for the selection of a suitable method of tunnelling for the Pummersdorf Tunnel / Risikoanalyse zur Wahl der geeigneten Vortriebsmethode für den Tunnel Pummersdorf. Dans: Geomechanics and Tunnelling, v. 4, n. 5 ( 2011). (2011):
- Wientalsammler – EPB-Schild unter dem Wienfluss im Herzen Wiens. Dans: Felsbau, v. 23, n. 5 ( 2005). (2005):