Essam Ayoub
- (2024): Extradosed Bridge Part of the Third Ring Road of Mecca – Conceptual Design. Présenté pendant: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- (2013): Effect of Skewness on Bridges Subjected to Seismic Loading. Présenté pendant: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.
- (2014): Transversal Earthquake loading. Présenté pendant: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
- Dynamic response assessment in compliance with the Eurocodes for the elevated viaducts of the Doha Metro Green Line. Dans: Structural Concrete, v. 18, n. 3 (juin 2017). (2017):
- Highlights of the design and construction of a 12 km elevated APM bridge project in Saudi Arabia. Dans: Structural Concrete, v. 14, n. 3 (septembre 2013). (2013):
- Considerations for the design of doubly unsymmetrical precast pretensioned beams used for box girder construction. Dans: Structural Concrete, v. 13, n. 3 (septembre 2012). (2012):