- Multi-criteria decision-making model for EPC contractor prequalification: a hybrid approach. Dans: International Journal of Building Pathology and Adaptation, v. 42, n. 3 (janvier 2022). (2022):
- Risks of water and wastewater PPP projects: an investors’ perspective. Dans: Construction Innovation, v. 22, n. 4 (octobre 2021). (2021):
- Low-cycle fatigue analysis of a new type of reduced-beam-section connection. Dans: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 176, n. 4 (avril 2023). (2023):
- Fatigue Reduction in Tubular Web Connections in Semi-deep Beams. Dans: International Journal of Steel Structures, v. 20, n. 4 ( 2020). (2020):
- Steel–concrete composite shear walls using precast high performance fiber reinforced concrete panels. Dans: The Structural Design of Tall and Special Buildings, v. 28, n. 10 (juillet 2019). (2019):
- The effect of concrete panel thickness upon composite steel plate shear walls. Dans: Journal of Constructional Steel Research, v. 117 (février 2016). (2016):
- Experimental and numerical study on steel-concrete composite shear wall using light-weight concrete. Dans: Journal of Constructional Steel Research, v. 126 (novembre 2016). (2016):
- Concrete Stiffened Steel Plate Shear Walls With an Unstiffened Opening. Dans: Structures, v. 12 (novembre 2017). (2017):
- The wall-frame and the steel-concrete interactions in composite shear walls. Dans: The Structural Design of Tall and Special Buildings, v. 27, n. 11 (10 août 2018). (2018):