Sadi A. Assaf
- Causes of Delay in Large Building Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 11, n. 2 (mars 1995). (1995):
- Factors effecting construction contractors' performance. This paper outlines characteristics and their degree of influence on performance level based on a study of royal commission projects executed by 36 different Saudi and joint venture firms in the Eastern province of Saudi Arabia. Dans: Building Research & Information, v. 24, n. 3 ( 1996). (1996):
- Factors affecting construction practices in Makkah Al‐Mukkaramah, Saudi Arabia. Detailed survey of randomly selected contractors, consultants and government agencies revealed ten major factors. Dans: Building Research & Information, v. 24, n. 1 ( 1996). (1996):
- Professional architectural/engineering consultancy practices in Saudi Arabia. Study explores the profile of the architectural/ engineering, A/E, consultancy practices in Saudi Arabia and addresses the scope of services offered by local A/Es, the projects undertaken, the clients they serve, methods of acquiring design projects and fees paid. Dans: Building Research & Information, v. 24, n. 1 ( 1996). (1996):
- Quality practices in design organizations. Dans: Construction Management and Economics, v. 17, n. 6 (novembre 1999). (1999):
- Contractors' Views of the Potential Causes of Inconsistencies between Design and Construction in Saudi Arabia. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 20, n. 1 (février 2006). (2006):