C. Arya
- Whole life cost analysis in concrete bridge tender evaluation. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 157, n. 1 (mars 2004). (2004):
- Effect of cement type on chloride binding and corrosion of steel in concrete. Dans: Cement and Concrete Research, v. 25, n. 4 (mai 1995). (1995):
- Factors influencing chloride-binding in concrete. Dans: Cement and Concrete Research, v. 20, n. 2 (mars 1990). (1990):
- Problem of Predicting Risk of Corrosion of Steel in Chloride Contaminated Concrete. Dans: Proceedings of the Institution of Civil Engineers, v. 88, n. 5 (octobre 1990). (1990):
- An assessment of four methods of determining the free chloride content of concrete. Dans: Materials and Structures, v. 23, n. 5 (juin 1990). (1990):
- TR 55: Design guidance for stengthening concrete structures using fibre composite materials: a review. Dans: Engineering Structures, v. 24, n. 7 (juillet 2002). (2002):
- Long-term maintenance strategies for highway bridges. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 159, n. 2 (juin 2006). (2006):
- Whole life cost analysis in concrete bridge tender evaluation. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 157, n. 1 (mars 2004). (2004):