Yoshinori Araki
- A Fundamental Study For Direct Measurement Of Maximum Principal Stress By Hydraulic Fracturing. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1990, n. 418 (juin 1990). (1990):
- A Study on the Selection of Steel or Prestressed Concrete Cable Stayed Bridge By Using Disaggregate Behavioral Model. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1994, n. 498 (septembre 1994). (1994):
- A Study On The Application Of Neural Network As The Process Of Support Selection For Tunnel Construction With Natm. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1995, n. 522 (septembre 1995). (1995):
- Study On The Evaluation Method Of Debris Flow And The Hillside Landslide Scale Of Debris Flow In Hazardous Torrent. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1995, n. 522 (septembre 1995). (1995):
- A Study On The Evaluation Of The Cutting Rate Of The Partial Face Machine By Using A Schmidt Rock Hammer With A Cone Shaped Plunger. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1995, n. 528 (décembre 1995). (1995):
- A Study On The Method For Determining Critical Rainfall In A Sediment Collapse Due To Natural Factors. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1997, n. 574 (septembre 1997). (1997):
- A Study On The Real-time Judgement Model Of Sediment Stability Of Neural Network For Collapse And Debris-flow In Hazard Torrent. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1997, n. 581 (décembre 1997). (1997):
- A Study On The Maximum Displacement Estimation Model Of Neural Network For Tunnel Construction With NATM. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1997, n. 581 (décembre 1997). (1997):
- A Study On The Change Of Destruction Form And Scale To Debris-flow And Collapse Of Debris-flow In Hazardous Torrent. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1997, n. 581 (décembre 1997). (1997):
- Debris Flow Rule Based On Rough Set Theory Extraction From Disaster Caused By The Nagasaki Heavy Rain In July, 1982. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 2002, n. 721 (décembre 2002). (2002):