H. Arai
- Identification of Correlation between Demand Performances to Damage of Lining Concrete for Tunnel Management. Dans: Procedia Engineering, v. 14 ( 2011). (2011):
- 首都高速湾岸線東扇島高架橋 (仮称) の施工 (Construction of the Higashi-Ohgishima Viaduct (tentative name) on the Metropolitan Expressway Bay-shore Route). Dans: Concrete Journal (JCI), v. 32, n. 5 ( 1994). (1994):
- Solution method of the time transient moving boundary problems using generalized porous media technique. Dans: Journal of Wind Engineering and Industrial Aerodynamics, v. 46-47 (août 1993). (1993):
- Optimum Cable-Force Adjustments in Concrete Cable-Stayed Bridges. Dans: Journal of Structural Engineering (ASCE), v. 121, n. 4 (avril 1995). (1995):
- The effects of mechanical dampers on stay cables with high-damping rubber. Dans: Construction and Building Materials, v. 12, n. 2-3 (mars 1998). (1998):