Eiji Arai
- Action-based union of the temporal opposites in scheduling: non-deterministic approach. Dans: Automation in Construction, v. 12, n. 3 (mai 2003). (2003):
- Action-based union of the temporal opposites and elastic activity network in scheduling. Dans: Automation in Construction, v. 15, n. 5 (septembre 2006). (2006):
- Parts and packets unification radio frequency identification (RFID) application for construction. Dans: Automation in Construction, v. 14, n. 4 (août 2005). (2005):