James Apted
- Delivering London 2012: Contaminated soil treatment at the Olympic Park. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 166, n. 1 (février 2013). (2013):
- Delivering London 2012: geotechnical enabling works. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 164, n. 6 (novembre 2011). (2011):