Ahmet Apaydin
- Assessment of the factors affecting the advance rate of the Tunnel Gerede, the longest and one of the most problematic water transmission tunnels of Turkey. Dans: Tunnelling and Underground Space Technology, v. 89 (juillet 2019). (2019):