Stuart Anderson
- Developing a logistic regression model to measure project complexity. Dans: Architectural Engineering and Design Management, v. 18, n. 3 (janvier 2022). (2022):
- Synthesis of Performance Measures for Highway Cost Estimating. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 3 (mai 2014). (2014):
- Identifying, Communicating, and Responding to Project Value Interests. Dans: Journal of Management in Engineering (ASCE), v. 29, n. 1 (janvier 2013). (2013):
- Construction Project Cost Escalation Factors. Dans: Journal of Management in Engineering (ASCE), v. 25, n. 4 (octobre 2009). (2009):
- Framework for Competency and Capability Assessment for Resource Allocation. Dans: Journal of Management in Engineering (ASCE), v. 18, n. 1 (janvier 2002). (2002):
- Modeling Process Management in Construction. Dans: Journal of Management in Engineering (ASCE), v. 13, n. 5 (septembre 1997). (1997):
- Exploring and Assessing Project Complexity. Dans: Journal of Construction Engineering and Management, v. 143, n. 5 (mai 2017). (2017):
- Strategies for Planned Project Acceleration. Dans: Journal of Construction Engineering and Management, v. 137, n. 5 (mai 2011). (2011):
- Pavement Reconstruction Scenarios Using Precast Concrete Pavement Panels. Dans: Practice Periodical on Structural Design and Construction, v. 12, n. 4 (novembre 2007). (2007):
- Comparison between Current Industry Methods and an Energy Simulation Model for Quantifying Energy Service Projects. Dans: Journal of Architectural Engineering (ASCE), v. 22, n. 2 (juin 2016). (2016):
- Current Industry Methods for Quantifying Energy Service Projects: Key Findings and Lessons Learned. Dans: Journal of Architectural Engineering (ASCE), v. 22, n. 2 (juin 2016). (2016):
- Construction Engineering Education: History and Challenge. Dans: Journal of Construction Engineering and Management, v. 137, n. 10 (octobre 2011). (2011):