John Anderson
- (2023): A Nielsen Arch Rail Bridge Designed to Survive an Extreme Earthquake Event. Présenté pendant: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023.
- Briefing: Proposed work at height regulations. Dans: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 157, n. 1 (mars 2004). (2004):
- (2022): Adapting the Simple Through Girder to Sit in Nature, The Wupperthal Footbridge. Présenté pendant: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022.
- (2022): The Many Inputs To Creating a Single Moving Form, the V&A Swingbridge. Présenté pendant: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022.
- (2018): Msikaba and Mtentu River Bridges – Large Scale Infrastructure in Rural South Africa. Présenté pendant: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018.
- (2018): Sydney Metro Cable Stayed Bridge, a Meeting of Precast Segmental Concrete and Cable Stayed Construction Technology. Présenté pendant: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018.
- Recognising leadership and management competencies: progress with implementation. Dans: Australian Journal of Civil Engineering, v. 2, n. 1 ( 2005). (2005):
- Can we have a 'safety culture' in the tunnelling business?. Dans: Tunnelling and Underground Space Technology, v. 13, n. 3 (juillet 1998). (1998):
- Minimising underground construction risks requires maximum engineering effort. Dans: Tunnelling and Underground Space Technology, v. 13, n. 4 (octobre 1998). (1998):
- Near-Fault Ground Motion Effects on Reinforced Concrete Bridge Columns. Dans: Journal of Structural Engineering (ASCE), v. 133, n. 7 (juillet 2007). (2007):
- Buitengragt Structural Steel Pedestrian Bridge - a Continuous Asymmterical Box Girder. Présenté pendant: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- Steel Cable-Stayed Bridges: Attractive Structures that can be Developed at an Affordable Price. Présenté pendant: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- Markgraaff Pedestrian Bridge: An Un-Braced Steel Network Arch Bridge. Présenté pendant: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- Cable Stressing Sequence of a Rock Anchored Cable Stayed Bridge. Présenté pendant: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- Design of the Isando Cable Stayed Pedestrian Bridge – the Walking Wonder. Présenté pendant: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- Design of a Four Span Self-Anchored Arch Supported Stress Ribbon Footbridge. Présenté pendant: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- Ensuring Safety Needs a Structured Approach to the Management of Diversity and Uncertainty. Dans: Felsbau, v. 19, n. 5 ( 2001). (2001):
- (2010): Measuring Sustainability: Tools for Transitioning to an Ecological Age. Présenté pendant: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010.