Abdulmohsen Al‐Hammad
- The effect of faulty construction on building maintenance. The results of a survey of 90 contractors, 30 architectural/engineering firms and 20 owners from the eastern province of Saudi Arabia identified 35 defect factors during the construction stage. Dans: Building Research & Information, v. 23, n. 3 ( 1995). (1995):
- Factors affecting the relationship between contractors and their sub‐contractors in Saudi Arabia. About 70% of contract work is subcontracted in Saudi Arabia, this paper highlights literature search and pilot interview findings. Dans: Building Research & Information, v. 21, n. 5 ( 1993). (1993):
- Design — Construction interface problems in Saudi Arabia. Survey showed that working drawing details, unfamiliarity with local conditions and buildability ranked as highest interface problems. Dans: Building Research & Information, v. 20, n. 1 ( 1992). (1992):