S. M. Reza Alavipour
- Maximizing expected contractor profit using an integrated model. Dans: Engineering, Construction and Architectural Management, v. 26, n. 1 (février 2019). (2019):
- Trends in Expectations about Duties and Responsibilities of Construction Managers. Dans: Journal of Construction Engineering and Management, v. 145, n. 7 (juillet 2019). (2019):
- Optimizing Financing Cost in Construction Projects with Fixed Project Duration. Dans: Journal of Construction Engineering and Management, v. 144, n. 4 (avril 2018). (2018):
- Time-cost tradeoff analysis with minimized project financing cost. Dans: Automation in Construction, v. 98 (février 2019). (2019):