0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Ali Mohammed Alashwal ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Al-Sabahi, Mohammed Hatim / Ismail, Muhammad Azzam / Alashwal, Ali Mohammed / Al-Obaidi, Karam M. (2022): Triangulation Method to Assess Indoor Environmental Conditions and Occupant Comfort and Productivity towards Low Energy Buildings in Malaysia. Dans: Buildings, v. 12, n. 11 (27 octobre 2022).

    https://doi.org/10.3390/buildings12111788

  2. Zouher Al-Sibaie, Eyad / Alashwal, Ali Mohammed / Abdul-Rahman, Hamzah / Zolkafli, Umi Kalsum (2014): Determining the relationship between conflict factors and performance of international construction projects. Dans: Engineering, Construction and Architectural Management, v. 21, n. 4 (juillet 2014).

    https://doi.org/10.1108/ecam-03-2014-0034

  3. Alashwal, Ali Mohammed / Al-Sabahi, Mohammed Hatim (2019): Risk Factors in Construction Projects during Unrest Period in Yemen. Dans: Journal of Construction in Developing Countries, v. 23, n. 2 ( 2019).

    https://doi.org/10.21315/jcdc2018.23.2.4

  4. Alashwal, Ali Mohammed / Abdul-Rahman, Hamzah / Asef, Arash (2017): Influence of Organizational Learning and Firm Size on Risk Management Maturity. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 6 (novembre 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000553

  5. Alashwal, Ali Mohammed / Abdul-Rahman, Hamzah / Radzi, Juwita (2016): Knowledge Utilization Process in Highway Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 4 (juillet 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000429

  6. Alashwal, Ali Mohammed / Chew, Min Yi (2017): Simulation techniques for cost management and performance in construction projects in Malaysia. Dans: Built Environment Project and Asset Management, v. 7, n. 5 (novembre 2017).

    https://doi.org/10.1108/bepam-11-2016-0058

  7. Alashwal, Ali Mohammed / Fareed, Nurfarhana Farza / Al-obaidi, Karam Mustafa (2017): Determining Success Criteria and Success Factors for International Construction Projects for Malaysian Contractors. Dans: Construction Economics and Building, v. 17, n. 2 (juin 2017).

    https://doi.org/10.5130/ajceb.v17i2.5319

  8. Alashwal, Ali Mohammed / Abdul-Rahman, Hamzah (2014): Aspects of project learning in construction: a socio-technical model. Dans: Construction Innovation, v. 14, n. 2 (avril 2014).

    https://doi.org/10.1108/ci-06-2013-0029

  9. Alashwal, Ali Mohammed / Abdul-Rahman, Hamzah (2014): Using PLS-PM to model the process of inter-project learning in construction projects. Dans: Automation in Construction, v. 44 (août 2014).

    https://doi.org/10.1016/j.autcon.2013.11.010

  10. Alashwal, Ali Mohammed / Fong, Patrick Sik-wah (2015): Empirical Study to Determine Fragmentation of Construction Projects. Dans: Journal of Construction Engineering and Management, v. 141, n. 7 (juillet 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000986

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine