-
Rebai, Slim / Sepúlveda, Italo / AlBalkhy, Wassim / Hamdi, Olfa / Lafhaj, Zoubeir / Alarcon, Luis F. / Yim, Pascal (2024): Barriers to Adopting Advanced Work Packaging (AWP) in Construction. Dans: Buildings, v. 14, n. 4 (27 mars 2024).
https://doi.org/10.3390/buildings14041032
-
Alarcon, Luis F. / Baladrón, Cristóbal / Gahona, Patricio / Long, David (2023): Lean Methodologies and Productivity in Mining Development – A Case in a Public Company. Dans: Revista Ingeniería de Construcción, v. 39 ( 2023).
https://doi.org/10.7764/ric.00085.21
-
Alarcon, Luis F. (2023): Lean in the Public Sector. Dans: Revista Ingeniería de Construcción, v. 39 ( 2023).
https://doi.org/10.7764/ric.00094.21
-
Alarcon, Luis F. / Diethelm, Sven / Rojo, Oscar / Calderón, Rodrigo (2008): Assessing the impacts of implementing lean construction. Dans: Revista Ingeniería de Construcción, v. 23, n. 1 (avril 2008).
https://doi.org/10.4067/s0718-50732008000100003
-
Ortega, Jesús / Mesa, Harrison A. / Alarcon, Luis F. (2023): The interrelationship between barriers impeding the adoption of off-site construction in developing countries: The case of Chile. Dans: Journal of Building Engineering, v. 73 (août 2023).
https://doi.org/10.1016/j.jobe.2023.106824
-
Salazar, Luis A. / Ballard, Glenn / Arroyo, Paz / Alarcon, Luis F. (2022): Development of a Commitment Management System for Construction Projects. Dans: Journal of Construction Engineering and Management, v. 148, n. 12 (décembre 2022).
https://doi.org/10.1061/(asce)co.1943-7862.0002376
-
Giménez, Zulay / Mourgues, Claudio / Alarcon, Luis F. / Mesa, Harrison (2022): Exploring Value Generation in Target Value Design Applying a Value Analysis Model. Dans: Buildings, v. 12, n. 7 (5 juillet 2022).
https://doi.org/10.3390/buildings12070922
-
Herrera, Rodrigo F. / Mourgues, Claudio / Alarcon, Luis F. / Pellicer, Eugenio (2021): Comparing Team Interactions in Traditional and BIM-Lean Design Management. Dans: Buildings, v. 11, n. 10 (22 septembre 2021).
https://doi.org/10.3390/buildings11100447
-
Lagos, Camilo I. / Alarcon, Luis F. (2021): Assessing the Relationship between Constraint Management and Schedule Performance in Chilean and Colombian Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 5 (septembre 2021).
https://doi.org/10.1061/(asce)me.1943-5479.0000942
-
Calahorra-Jimenez, Maria / Torres-Machi, Cristina / Chamorro, Alondra / Alarcon, Luis F. / Molenaar, Keith (2021): Importance of Noncost Criteria Weighing in Best-Value Design–Build US Highway Projects. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 4 (juillet 2021).
https://doi.org/10.1061/(asce)me.1943-5479.0000912
-
Tran, Dai Q. / Molenaar, Keith R. / Alarcon, Luis F. (2016): A Hybrid Cross-Impact Approach to Predicting Cost Variance of Project Delivery Decisions for Highways. Dans: Journal of Infrastructure Systems, v. 22, n. 1 (mars 2016).
https://doi.org/10.1061/(asce)is.1943-555x.0000270
-
Martinez, Jhonattan G. / Albeaino, Gilles / Gheisari, Masoud / Issa, Raja R. A. / Alarcon, Luis F. (2021): iSafeUAS: An unmanned aerial system for construction safety inspection. Dans: Automation in Construction, v. 125 (mai 2021).
https://doi.org/10.1016/j.autcon.2021.103595
-
Herrera, Rodrigo F. / Mourgues, Claudio / Alarcon, Luis F. / Pellicer, Eugenio (2021): Analyzing the Association between Lean Design Management Practices and BIM Uses in the Design of Construction Projects. Dans: Journal of Construction Engineering and Management, v. 147, n. 4 (avril 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002014
-
Mandujano, María G. / Mourgues, Claudio / Alarcon, Luis F. / Kunz, John (2017): Modeling Virtual Design and Construction Implementation Strategies Considering Lean Management Impacts. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 32, n. 11 (octobre 2017).
https://doi.org/10.1111/mice.12253
-
Castillo, Tito / Alarcon, Luis F. / Pellicer, Eugenio (2018): Influence of Organizational Characteristics on Construction Project Performance Using Corporate Social Networks. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 4 (juillet 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000612
-
Castillo, Tito / Alarcon, Luis F. / Pellicer, Eugenio (2018): Finding Differences among Construction Companies’ Management Practices and Their Relation to Project Performance. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 3 (mai 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000606
-
Alarcon, Luis F. / Maturana, Sergio / Schonherr, Ignacio (2009): Impact of Using an E-Marketplace in the Construction Supply Process: Lessons from a Case Study. Dans: Journal of Management in Engineering (ASCE), v. 25, n. 4 (octobre 2009).
https://doi.org/10.1061/(asce)0742-597x(2009)25:4(214)
-
Costa, Dayana B. / Formoso, Carlos T. / Kagioglou, Michail / Alarcon, Luis F. / Caldas, Carlos H. (2006): Benchmarking Initiatives in the Construction Industry: Lessons Learned and Improvement Opportunities. Dans: Journal of Management in Engineering (ASCE), v. 22, n. 4 (octobre 2006).
https://doi.org/10.1061/(asce)0742-597x(2006)22:4(158)
-
Rischmoller, Leonardo / Alarcon, Luis F. / Koskela, Lauri (2006): Improving Value Generation in the Design Process of Industrial Projects Using CAVT. Dans: Journal of Management in Engineering (ASCE), v. 22, n. 2 (avril 2006).
https://doi.org/10.1061/(asce)0742-597x(2006)22:2(52)
-
Yepes, Víctor / Pellicer, Eugenio / Alarcon, Luis F. / Correa, Christian L. (2016): Creative Innovation in Spanish Construction Firms. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 142, n. 1 (janvier 2016).
https://doi.org/10.1061/(asce)ei.1943-5541.0000251
-
Rojas, María J. / Herrera, Rodrigo F. / Mourgues, Claudio / Ponz-Tienda, José L. / Alarcon, Luis F. / Pellicer, Eugenio (2019): BIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projects. Dans: Advances in Civil Engineering, v. 2019 ( 2019).
https://doi.org/10.1155/2019/9094254
-
Freire, Javier / Alarcon, Luis F. (2002): Achieving Lean Design Process: Improvement Methodology. Dans: Journal of Construction Engineering and Management, v. 128, n. 3 (juin 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:3(248)
-
Alarcon, Luis F. / Ashley, David B. (1996): Modeling Project Performance for Decision Making. Dans: Journal of Construction Engineering and Management, v. 122, n. 3 (septembre 1996).
https://doi.org/10.1061/(asce)0733-9364(1996)122:3(265)
-
Castillo, Gustavo / Alarcon, Luis F. / González, Vicente A. (2015): Implementing Lean Production in Copper Mining Development Projects: Case Study. Dans: Journal of Construction Engineering and Management, v. 141, n. 1 (janvier 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0000917
-
Alarcon, Luis F. / Rodriguez, Andres / Mourgues, Claudio (2012): Impact of Machine-Failure Costs on Equipment Replacement Policies: Tunneling Company Case Study. Dans: Journal of Construction Engineering and Management, v. 138, n. 6 (juin 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000480
-
Rivas, Rodrigo A. / Borcherding, John D. / González, Vicente / Alarcon, Luis F. (2011): Analysis of Factors Influencing Productivity Using Craftsmen Questionnaires: Case Study in a Chilean Construction Company. Dans: Journal of Construction Engineering and Management, v. 137, n. 4 (avril 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000274
-
Castillo, Tito / Alarcon, Luis F. / Salvatierra, José Luis (2018): Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects. Dans: Journal of Construction Engineering and Management, v. 144, n. 3 (mars 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001443
-
González, Vicente / Alarcon, Luis F. / Maturana, Sergio / Mundaca, Fernando / Bustamante, José (2010): Improving Planning Reliability and Project Performance Using the Reliable Commitment Model. Dans: Journal of Construction Engineering and Management, v. 136, n. 10 (octobre 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000215
-
Pellicer, Eugenio / Yepes, Víctor / Correa, Christian L. / Alarcon, Luis F. (2014): Modelo para la Innovación Sistemática en Empresas Constructoras. Dans: Journal of Construction Engineering and Management, v. 140, n. 4 (avril 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000468
-
Pellicer, Eugenio / Yepes, Víctor / Correa, Christian L. / Alarcon, Luis F. (2014): Model for Systematic Innovation in Construction Companies. Dans: Journal of Construction Engineering and Management, v. 140, n. 4 (avril 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000700