Saad Al-Jibouri
- Application of Reference Class Forecasting in Turkish Public Construction Projects: Contractor Perspective. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 3 (mai 2016). (2016):
- Lean Transformation in a Modular Building Company: A Case for Implementation. Dans: Journal of Management in Engineering (ASCE), v. 29, n. 1 (janvier 2013). (2013):
- Proposed System for Measuring Project Performance Using Process-Based Key Performance Indicators. Dans: Journal of Management in Engineering (ASCE), v. 28, n. 2 (avril 2012). (2012):
- Proposed Model for Integrating RAMS Method in the Design Process in Construction. Dans: Architectural Engineering and Design Management, v. 5, n. 4 (janvier 2009). (2009):
- Learning to be Real Engineers. The Dam Game Simulation. Dans: Architectural Engineering and Design Management, v. 2, n. 1-2 (janvier 2006). (2006):
- Ergonomic Analysis and the Need for Its Integration for Planning and Assessing Construction Tasks. Dans: Journal of Construction Engineering and Management, v. 138, n. 12 (décembre 2012). (2012):
- Automated post-simulation visualization of modular building production assembly line. Dans: Automation in Construction, v. 21 (janvier 2012). (2012):
- Post simulation visualization model for effective scheduling of modular building construction. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (septembre 2012). (2012):
- Efficacy of Estimation Methods in Forecasting Building Projects' Costs. Dans: Journal of Construction Engineering and Management, v. 142, n. 11 (novembre 2016). (2016):