Alireza Ahmadian Fard Fini
- Production-oriented approach for optimal mass-customisation of floor panel layouts in cross-laminated timber (CLT) buildings. Dans: Engineering, Construction and Architectural Management. :
- Simulation and modeling of polymer concrete panels using deep neural networks. Dans: Case Studies in Construction Materials, v. 20 (juillet 2024). (2024):
- Towards digital approach for managing request for information (RFI) in construction projects: a literature review. Dans: Construction Innovation. :
- Tracking indoor construction progress by deep-learning-based analysis of site surveillance video. Dans: Construction Innovation. :
- A deep learning-based approach to facilitate the as-built state recognition of indoor construction works. Dans: Construction Innovation, v. 24, n. 4 (août 2023). (2023):
- (2023): Construction Workforce’s Mental Health: Research and Policy Alignment in the Australian Construction Industry. Dans: Buildings, v. 13, n. 2 (14 février 2023).
- Development of a refined illumination and reflectance approach for optimal construction site interior image enhancement. Dans: Construction Innovation, v. 24, n. 2 (octobre 2022). (2022):
- Applications of electroencephalography in construction. Dans: Automation in Construction, v. 133 (janvier 2022). (2022):
- Mass-customisation of cross-laminated timber wall systems at early design stages. Dans: Automation in Construction, v. 132 (décembre 2021). (2021):
- Computer vision-based interior construction progress monitoring: A literature review and future research directions. Dans: Automation in Construction, v. 127 (juillet 2021). (2021):
- Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction. Dans: Engineering, Construction and Architectural Management, v. 29, n. 2 (mai 2021). (2021):
- Optimization of flexible lift processes on high-rise building construction sites. Dans: Automation in Construction, v. 107 (novembre 2019). (2019):
- Optimization of Job Allocation in Construction Organizations to Maximize Workers' Career Development Opportunities. Dans: Journal of Construction Engineering and Management, v. 145, n. 6 (juin 2019). (2019):
- Job Assignment Based on Brain Demands and Human Resource Strategies. Dans: Journal of Construction Engineering and Management, v. 143, n. 5 (mai 2017). (2017):
- Incorporating Multiskilling and Learning in the Optimization of Crew Composition. Dans: Journal of Construction Engineering and Management, v. 142, n. 5 (mai 2016). (2016):
- Dynamic Programming Approach toward Optimization of Workforce Planning Decisions. Dans: Journal of Construction Engineering and Management, v. 144, n. 2 (février 2018). (2018):
- Enhancing the safety of construction crew by accounting for brain resource requirements of activities in job assignment. Dans: Automation in Construction, v. 88 (avril 2018). (2018):