Abbas Afshar
- Developing a simulation-optimization approach to allocate low impact development practices for managing hydrological alterations in urban watershed. Dans: Sustainable Cities and Society, v. 61 (octobre 2020). (2020):
- Simulation-optimization model for non-point source pollution management in watersheds: Application of cooperative game theory. Dans: KSCE Journal of Civil Engineering, v. 17, n. 6 (août 2013). (2013):
- Fuzzy Optimization Model for Earthwork Allocations with Imprecise Parameters. Dans: Journal of Construction Engineering and Management, v. 133, n. 2 (février 2007). (2007):
- Multi objective calibration of large scaled water quality model using a hybrid particle swarm optimization and neural network algorithm. Dans: KSCE Journal of Civil Engineering, v. 16, n. 6 (septembre 2012). (2012):
- Multi-objective optimization response modeling to contaminated water distribution networks: Pressure driven versus demand driven analysis. Dans: KSCE Journal of Civil Engineering, v. 21, n. 6 (décembre 2016). (2016):
- GA-based multi-objective optimization of finance-based construction project scheduling. Dans: KSCE Journal of Civil Engineering, v. 14, n. 5 (juillet 2010). (2010):
- A min-max regret approach to unbalanced bidding in construction. Dans: KSCE Journal of Civil Engineering, v. 14, n. 5 (juillet 2010). (2010):
- Fuzzy-based MOGA approach to stochastic time–cost trade-off problem. Dans: Automation in Construction, v. 18, n. 5 (août 2009). (2009):
- CPM/LOB Scheduling Method for Project Deadline Constraint Satisfaction. Dans: Automation in Construction, v. 48 (décembre 2014). (2014):
- A case-based reasoning approach to application of value engineering methodology in the construction industry. Dans: Construction Management and Economics, v. 26, n. 4 ( 2008). (2008):
- Time–cost optimization: using GA and fuzzy sets theory for uncertainties in cost. Dans: Construction Management and Economics, v. 26, n. 7 (juillet 2008). (2008):
- Integrating system dynamics and fuzzy logic modelling for construction risk management. Dans: Construction Management and Economics, v. 26, n. 11 (novembre 2008). (2008):
- Dynamic risk analysis in construction projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 8 (août 2008). (2008):
- Cooperative Game Theoretic Framework for Joint Resource Management in Construction. Dans: Journal of Construction Engineering and Management, v. 140, n. 3 (mars 2014). (2014):