Theophilus Adjei-Kumi
- Analysis of the underlying factors affecting BIM-LCA integration in the Ghanaian construction industry: a factor analysis approach. Dans: Construction Innovation. :
- Duration determination for rural roads using the principal component analysis and artificial neural network. Dans: Engineering, Construction and Architectural Management, v. 23, n. 5 (septembre 2016). (2016):
- Participatory design, wicked problems, choosing by advantages. Dans: Engineering, Construction and Architectural Management, v. 24, n. 2 (mars 2017). (2017):
- Ascertaining the impact of contractors pre-qualification criteria on project success criteria. Dans: Engineering, Construction and Architectural Management, v. 26, n. 4 (mai 2019). (2019):
- Modelling the adoption of sustainable procurement in construction organisations. Dans: Built Environment Project and Asset Management, v. 8, n. 5 (novembre 2018). (2018):
- Forecasting Construction Tender Price Index in Ghana using Autoregressive Integrated Moving Average with Exogenous Variables Model. Dans: Construction Economics and Building, v. 18, n. 1 (mars 2018). (2018):
- (2008): Customisation and Desirable Characteristics of a Standard Method of Measurement for Building Works in Ghana. Dans: Australasian Journal of Construction Economics and Building, v. 8, n. 2 (novembre 2008).
- Application of the CBA Decision System to Manage User Preferences in the Design Process. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 142, n. 1 (janvier 2016). (2016):
- Choosing By Advantages incorporated framework for a user-involved design process. Dans: Architectural Engineering and Design Management, v. 14, n. 3 (mars 2018). (2018):
- An exploration of the choosing by advantages decision system as a user engagement tool in participatory design. Dans: Architectural Engineering and Design Management, v. 12, n. 1 (novembre 2015). (2015):