- Probabilistic Models to Evaluate Effectiveness of Steel Bridge Weld Fatigue Retrofitting by Peening. Dans: Transportation Research Record: Journal of the Transportation Research Board, v. 2285, n. 1 (janvier 2012). (2012):
- A preliminary investigation of the potential benefits of using the ASTRA Bridge for short-span bridge deck refurbishment projects in Switzerland. Dans: Structure and Infrastructure Engineering. :
- Required accuracy of information when determining optimal railway intervention programmes. Dans: Infrastructure Asset Management, v. 9, n. 1 (mars 2022). (2022):
- Quantifying net benefits of intervention programmes to enable their digitalised generation. Dans: Infrastructure Asset Management, v. 8, n. 3 (septembre 2021). (2021):
- Using Bayesian Networks to Estimate Bridge Characteristics in Early Road Designs. Dans: Infrastructure Asset Management, v. 9, n. 1 (mars 2022). (2022):
- Quantitative investigation on the accuracy and precision of Scan-to-BIM under different modelling scenarios. Dans: Automation in Construction, v. 126 (juin 2021). (2021):
- Use of Unmanned Aerial Vehicle Photogrammetry to Obtain Topographical Information to Improve Bridge Risk Assessment. Dans: Journal of Infrastructure Systems, v. 24, n. 1 (mars 2018). (2018):
- Sustainable funding strategies for stormwater infrastructure management: A system dynamics model. Dans: Sustainable Cities and Society, v. 64 (janvier 2021). (2021):
- Usefulness of quantifying effects on rail service when comparing intervention strategies. Dans: Infrastructure Asset Management, v. 7, n. 3 (septembre 2020). (2020):
- A road infrastructure asset management process: gains in efficiency and effectiveness. Dans: Infrastructure Asset Management, v. 6, n. 1 (mars 2019). (2019):
- Supplier-contractor coordination approach to managing demand fluctuations of ready-mix concrete. Dans: Automation in Construction, v. 121 (janvier 2021). (2021):
- Prioritizing Preproject Planning Activities Using Value of Information Analysis. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 5 (septembre 2020). (2020):
- Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies. Dans: Construction Innovation, v. 20, n. 3 (juin 2020). (2020):
- Prioritizing transportation network recovery using a resilience measure. Dans: Sustainable and Resilient Infrastructure, v. 7, n. 1 (février 2020). (2020):
- A surprising theorem to reduce the mathematical complexity of an important class of infrastructure maintenance problems. Dans: Sustainable and Resilient Infrastructure, v. 7, n. 1 (février 2020). (2020):
- A Real Option Approach To Determine Optimal Intervention Windows for Multi-national Rail Corridors. Dans: Journal of Civil Engineering and Management, v. 22, n. 1 (décembre 2015). (2015):
- Using real option methods as a tool to determine optimal building work programs. Dans: Structure and Infrastructure Engineering, v. 12, n. 11 (novembre 2016). (2016):
- Total Cost-Benefit Analysis of Alternative Corrosion Management Strategies for a Steel Roadway Bridge. Dans: Journal of Bridge Engineering (ASCE), v. 18, n. 4 (avril 2013). (2013):
- Productivity of digital fabrication in construction: Cost and time analysis of a robotically built wall. Dans: Automation in Construction, v. 92 (août 2018). (2018):