- Performance Barriers for Coordination of Health and Safety during the Preconstruction Phase of Construction Projects. Dans: Journal of Construction Engineering and Management, v. 149, n. 7 (juillet 2023). (2023):
- Contractor payment delays: a systematic review of current trends and future directions. Dans: Construction Innovation, v. 24, n. 5 (juin 2023). (2023):
- The design coordination role at the pre-construction stage of construction projects. Dans: Building Research & Information, v. 50, n. 4 (décembre 2021). (2021):
- Rethinking Urban Infrastructure Cost Management in Developing Countries. Dans: Journal of Urban Planning and Development, v. 142, n. 1 (mars 2016). (2016):
- Beyond the causes – rethinking mitigating measures to avert cost and time overruns in construction projects. Dans: Construction Innovation, v. 17, n. 3 (mai 2017). (2017):