Zinab Abuwarda
- Optimizing Construction Work–Rest Schedules and Worker Reassignment Utilizing Wristband Physiological Data. Dans: Journal of Construction Engineering and Management, v. 150, n. 11 (novembre 2024). (2024):
- Wearable devices: Cross benefits from healthcare to construction. Dans: Automation in Construction, v. 142 (octobre 2022). (2022):
- Multi-Dimensional Optimization Model for Schedule Fast-Tracking without Over-stressing Construction Workers. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 46, n. 12 (décembre 2019). (2019):
- Work-Package Planning and Schedule Optimization for Projects with Evolving Constraints. Dans: Journal of Computing in Civil Engineering, v. 30, n. 6 (novembre 2016). (2016):
- Flexible Activity Relations to Support Optimum Schedule Acceleration. Dans: Journal of Construction Engineering and Management, v. 142, n. 11 (novembre 2016). (2016):