Osama Y. Abudayyeh
- NIAM Conceptual Data‐Base Design in Construction Management. Dans: Journal of Computing in Civil Engineering, v. 6, n. 1 (janvier 1992). (1992):
- Prototype Integrated Cost and Schedule Control System. Dans: Journal of Computing in Civil Engineering, v. 7, n. 2 (avril 1993). (1993):
- Cost‐ and Schedule‐Control Integration: Issues and Needs. Dans: Journal of Construction Engineering and Management, v. 117, n. 3 (septembre 1991). (1991):
- Design of Construction Industry Information Management Systems. Dans: Journal of Construction Engineering and Management, v. 117, n. 4 (décembre 1991). (1991):
- A Multimedia Construction Delay Management System. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 12, n. 3 (mai 1997). (1997):
- (2010): Towards Sensor-Based Health Monitoring Systems for Bridge Decks: A Full-Depth Precast Deck Panels Case Study. Dans: Advances in Civil Engineering, v. 2010 ( 2010).