Hamid Abdirad
- Managing Digital Integration Routines in Engineering Firms: Cases of Disruptive BIM Cloud Collaboration Protocols. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 1 (janvier 2022). (2022):
- Restructuration of architectural practice in integrated project delivery (IPD): two case studies. Dans: Engineering, Construction and Architectural Management, v. 26, n. 1 (février 2019). (2019):
- Normative and descriptive models for COBie implementation: discrepancies and limitations. Dans: Engineering, Construction and Architectural Management, v. 26, n. 8 (août 2019). (2019):
- Disruptive information exchange requirements in construction projects: perception and response patterns. Dans: Building Research & Information, v. 49, n. 2 (mars 2020). (2020):
- Rebaselining Asset Data for Existing Facilities and Infrastructure. Dans: Journal of Computing in Civil Engineering, v. 34, n. 1 (janvier 2020). (2020):
- Fuzzy AHP Model for Prequalification of Engineering Consultants in the Iranian Public Procurement System. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 2 (mars 2017). (2017):
- Metric-based BIM implementation assessment: a review of research and practice. Dans: Architectural Engineering and Design Management, v. 13, n. 1 (décembre 2016). (2016):
- Barriers to effective implementation of quality management systems in public design projects in Iran. Dans: Architectural Engineering and Design Management, v. 11, n. 6 (juin 2015). (2015):