Zoning operation of multiple borehole ground heat exchangers to alleviate the ground thermal accumulation caused by unbalanced seasonal loads
Auteur(s): |
Mingzhi Yu
Kai Zhang Xizhong Cao Aijuan Hu Ping Cui Zhaohong Fang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Energy and Buildings, janvier 2016, v. 110 |
Page(s): | 345-352 |
DOI: | 10.1016/j.enbuild.2015.11.022 |
- Informations
sur cette fiche - Reference-ID
10469019 - Publié(e) le:
27.10.2020 - Modifié(e) le:
27.10.2020