Win-win pricing method for BOT projects using a simulation-based evolutionary optimization
Auteur(s): |
Nastaran Tavakoli
Seyed Hossein Hosseini Nourzad |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Construction Management and Economics, mai 2019, n. 2, v. 38 |
Page(s): | 1-15 |
DOI: | 10.1080/01446193.2019.1657234 |
- Informations
sur cette fiche - Reference-ID
10374898 - Publié(e) le:
21.09.2019 - Modifié(e) le:
26.01.2020