Use of Software Engineering on the Project Implementation Schedule of Lamreung Limpok Bridge
Auteur(s): |
Abdul Muhyi
Miftahul Hamzi Busra |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | IOP Conference Series: Materials Science and Engineering, 1 mai 2020, n. 1, v. 854 |
Page(s): | 012028 |
DOI: | 10.1088/1757-899x/854/1/012028 |
Abstrait: |
The development of technology is growing along with the time. It affects on development of construction management which several application programs are offered to facilitate construction management in term of implementing schedule and project data. The application program had facilitated the management to entry project data, manage project activities, project reports and control of project activities on lamreung limpok bridge, Lamgapang, Aceh besar, Aceh, Indonesia. The bridge incurred the expense of Rp.27.179.501.000.00 which it was supported by Aceh government budget 2018. The bridge connected the area of ulee kareng and limpok which the duration of project was 141 working days. This project consisted of 8 parameters in the activity that is the general work, drainage, work relate to land, aggregate pavement, asphalt pavement, structure, finishig, and maintenance. The issue of this study was the reach of project implementation schedule. This study will redesign the project schedule with the use of Microsoft Project 2013, The result showed that the duration of project was 122 working. Furthermore, the Gantt Chartand PDM had referred to the standard. |
- Informations
sur cette fiche - Reference-ID
10675196 - Publié(e) le:
29.05.2022 - Modifié(e) le:
29.05.2022