The use of FTA to evaluate the potential of BIM platform in building rehabilitation
Auteur(s): |
Fabiana Dias da Silva
Mônica Santos Salgado |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | PARC Pesquisa em Arquitetura e Construção, mars 2017, n. 1, v. 8 |
Page(s): | 3 |
DOI: | 10.20396/parc.v8i1.8649200 |
- Informations
sur cette fiche - Reference-ID
10411904 - Publié(e) le:
12.02.2020 - Modifié(e) le:
12.02.2020