Uncertainty in the Early Phase of a Municipal Building Refurbishment Project—A Case Study in Finland
Auteur(s): |
Ulrika Uotila
Arto Saari Juha-Matti Junnonen |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Buildings, 23 juillet 2020, n. 8, v. 10 |
Page(s): | 137 |
DOI: | 10.3390/buildings10080137 |
Abstrait: |
Municipal building refurbishment projects are carried out under conditions of high uncertainty and complexity, which often result in unsatisfying outcomes. In this research, a case study approach is used to provide a holistic presentation of the sources of uncertainties in the early phase of a municipal school refurbishment project in Finland. The study also explores how these sources are treated in the case project. It is considered that the uncertainty in the case study originated from three key sources: from the project due to the characteristics of existing buildings; from the organization due to the separately operating municipal units; from the municipal environment due to the municipal policy, and decision-making process. This study shows that more emphasis should be laid on the sources of uncertainty in the early phases of a municipal building refurbishment project for reaching proper decisions. In addition, the study presents suggestions for improving the municipal process. |
Copyright: | © 2020 by the authors; licensee MDPI, Basel, Switzerland. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
1.23 MB
- Informations
sur cette fiche - Reference-ID
10428774 - Publié(e) le:
30.07.2020 - Modifié(e) le:
02.06.2021