Truss Install Sequence on Deviation During Incremental Launching of a Box-truss Girder
Auteur(s): |
Liang Dong
Li Liang Liu Jing |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Proceedings of the Institution of Civil Engineers - Bridge Engineering, mars 2021, n. 1, v. 174 |
Page(s): | 1-28 |
DOI: | 10.1680/jbren.20.00007 |
- Informations
sur cette fiche - Reference-ID
10446415 - Publié(e) le:
10.10.2020 - Modifié(e) le:
26.02.2021