Transition from traditional to alternative project delivery methods in water and wastewater project: executive decision-makers' perspective
Auteur(s): |
Pramen P. Shrestha
Jacimaria R. Batista |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, juillet 2021, n. 7, v. 29 |
Page(s): | 2665-2688 |
DOI: | 10.1108/ecam-10-2020-0791 |
- Informations
sur cette fiche - Reference-ID
10614017 - Publié(e) le:
09.07.2021 - Modifié(e) le:
13.08.2022